Dam & Safety ›› 2021, Vol. 0 ›› Issue (1): 7-10.

Previous Articles     Next Articles

Application of non-electric hydraulic control emergency operator in disaster of Longtan hydropower station

WANG Yuguan, SONG Siyu and HAN Chao   

  1. PowerChina Beijing Engineering Co., Ltd.
  • Received:2020-04-02 Revised:2020-04-17 Online:2021-02-10 Published:2021-11-25

无电液控应急操作器在四川龙潭水电站抢险中的应用

王宇观1,宋思雨2,韩 超1   

  1. 1.中国电建集团北京勘测设计研究院有限公司,北京,100024;2. 北京世纪合兴起重科技有限公司,北京,102605
  • 作者简介:王宇观(1985—),男,河南郑州人,高级工程师,主要从事水利水电工程金属结构设计工作。

Abstract: The consequence of emergency in water conservancy and hydropower engineering is serious with wide range of influence. So we should prepare emergency plans in advance and train sophisticated emergency teams in order to do a good job in emergency work and ensure the safety of people's lives and property. The structure characteristics and operation mode of non-electric hydraulic control emergency operator are introduced in detail and analyzed by relevant cases.

Key words: hoist, emergency operation device, flood discharge of reservoir, safety guarantee

摘要: 水利水电工程遇突发事件后果较为严重,且影响范围广,应提前准备应急预案,培养高精尖应急队伍,方能切实做好应急工作,保障人民生命和财产安全。笔者对无电液控应急操作器的结构特点和操作方式进行了详细介绍,并结合相关应用案例进行了分析。

关键词: 启闭机, 应急操作装置, 水库泄洪, 安全保障

CLC Number: