Abstract: Based on a large-scale mixed gas diving project for a hydropower station in Sichuan, this paper introduces the pre-construction preparation, construction progress, medical support for diving, calculation of diver's gas consumption and the protection of diving equipment, worthy of reference.
Key words: hydropower station, mixed gas diving, high-altitude diving
摘要: 介绍了四川某水电站大规模混合气潜水项目的施工前准备、施工进展、潜水医学保障、潜水员耗气量统计计算及潜水装具、潜水设备的保障,为我国开展高海拔水电站混合气潜水作业服务提供参考和借鉴。
关键词: 水电站, 混合气潜水, 高海拔潜水
HU Yang, JIANG Jun-jun, WANG Wen-sheng, ZHANG Yun, XU Zi-jian, XUE Li-qun and QU Qing-lin. Introduction of large-scale mixed gas diving project for a hydropower station in Sichuan[J]. Dam & Safety, 2019, 0(3): 78-82.
胡 洋,姜骏骏,王文胜,张 云,徐子健,薛利群,曲青林. 四川某水电站大规模混合气潜水项目介绍[J]. 大坝与安全, 2019, 0(3): 78-82.