Analysis on treatment of freeze-thaw failure of tail sluice pier in a water conservancy project

XING Li-li and BI Jing-qing   

  1. Qingdao Pacific Diving & Technology Co., Ltd.
  • Received:2018-03-14 Revised:2018-03-19 Online:2018-06-08 Published:2018-06-08

某水利枢纽尾水闸墩冻融破坏处理浅析

邢立丽,毕经清   

  1. 青岛太平洋水下科技工程有限公司,山东  青岛,266200
  • 作者简介:邢立丽(1990- ),女,辽宁抚顺人,区域经理,主要从事水库大坝的水下施工。

Abstract: Different degrees of freeze-thaw damage appeared on the concrete in water-level-change area of the tail water sluice pier of a conservancy project. This paper introduces an engineering technology which uses a thin layer of underwater non-dispersive concrete to repair freeze-thaw damage in the tail water sluice pier. As well, the key technology and difficulty in construction are proposed, worthy reference for similar projects.

Key words: freeze-thaw damage, underwater non-dispersive concrete, tail sluice pier

摘要: 某水利枢纽尾水闸墩水位变化区混凝土出现不同程度的冻融破坏。笔者介绍了采用薄层水下不分散混凝土对尾水闸墩冻融破坏部位进行修复处理的相关施工工艺,提出了施工中的关键技术及难点,为同类工程施工提供了宝贵经验。

关键词: 冻融破坏, 水下不分散混凝土, 尾水闸墩