Inspection of Jilintai I hydropower dam after 8·9 Jinghe earthquake

GUO Yu-rong and CHEN Zhi-hua   

  1. Large Dam Safety Supervision Center, National Energy Administration
  • Received:2018-05-12 Online:2018-06-08 Published:2018-06-08

新疆吉林台一级水电站大坝“8·9 精河”地震后检查

郭玉嵘1,陈志华2   

  1. 1.国家能源局大坝安全监察中心,浙江  杭州,311122;2.浙江国贸集团东方机电工程股份有限公司,浙江  杭州,310016
  • 作者简介:郭玉嵘(1987- ),男,江苏盐城人,工程师,主要从事大坝安全监测与大坝安全技术管理工作。

Abstract: This paper introduces the safety assessment of Jilintai I hydropower dam after 8·9 Jinghe earthquake. Dam structure, water discharge structure and the slope were included in the site inspection. As well, dense monitoring was adopted after earthquake.

Key words: 8·9 Jinghe earthquake, hydropower dam, site inspection, dense monitoring

摘要: “8·9 精河”地震发生后,水电站运行单位及时对吉林台一级水电站大坝、泄洪建筑物、工程边坡等建筑物及近库岸进行现场检查,加密监测频次,结合现场检查及监测成果评价大坝安全状况。

关键词: &ldquo, 8·, 9精河&rdquo, 地震, 水电站大坝, 现场检查, 加密监测