Abstract: The Oroville dam spillway incident occurred on February 7, 2017 and now recovery is going on. The paper introduces the recovery design for the spillway and emergency spillway, the construction schedule as well as the contracts.
Key words: Oroville dam, spillway, emergency spillway, chute
摘要: 2017年2月7日,奥洛维尔大坝的溢洪道发生破坏,目前正在对其进行修复。文章介绍了对主溢洪道和非常溢洪道的修复设计方案、施工进度安排及合同情况等,供参考。
关键词: 奥洛维尔大坝, 主溢洪道, 非常溢洪道, 泄槽
California Department of Water Resources. Oroville spillway recovery: design and construction[J]. Dam & Safety, 2018, 0(1): 62-66.
加利福尼亚州水资源部. 美国奥洛维尔大坝溢洪道修复工程设计及实施进展[J]. 大坝与安全, 2018, 0(1): 62-66.