Abstract: Rangit River, a major tributary of River Teesta, in the Eastern Himalaya supplies the 60 MW Rangit Hydro Power Station which was commissioned in February 2000 by NHPC. However, the river transports a large quantity of silt with its water during the monsoon months of May to September and during an incident in 2006 the project's powerhouse was flooded.
Key words: Rangit dam, sediment, repair
摘要: 印度兰吉特河(Rangit)是提斯塔河(Teesta)的主要支流,位于东喜马拉雅地区。兰吉特水电站装机60 MW,于2000年2月投入运行。每年5~9月汛期之间,兰吉特河输沙量巨大,2006年,该电站发生水淹厂房事故。
关键词: 兰吉特大坝, 沉积物, 修复
Siba Prasad Sen. Sediment management for Rangit dam in India[J]. dam, 2017, 0(3): 67-.
印度·Siba Prasad Sen. 印度兰吉特大坝的泥沙管理[J]. 大坝与安全, 2017, 0(3): 67-.