dam ›› 2016, Vol. 0 ›› Issue (3): 73-.
Previous Articles Next Articles
ZHANG Shi-ping
Received:
Revised:
Online:
Published:
张士平
作者简介:
Abstract: The cause and passage of seepage at back-slope of main dam of upper reservoir of Tongbai pumped storage power station were found after detailed analysis. The effect of treatment was proved to be successful which ensured the safety of main dam.
Key words: main dam, back-slope of main dam, seepage analysis, treatment
摘要: 通过对桐柏蓄能电站上水库主坝坝后坡渗水的分析,找出确切的渗水原因及渗水通道,并对渗水进行了有效处理,解决了坝后坡渗水缺陷,确保了大坝安全。
关键词: 主坝, 坝后坡, 渗水分析, 处理
ZHANG Shi-ping. Seepage analysis and treatment for back-slope of main dam of upper reservoir of Tongbai pumped storage power station[J]. dam, 2016, 0(3): 73-.
张士平. 桐柏蓄能电站上水库主坝坝后坡渗水分析及处理[J]. 大坝与安全, 2016, 0(3): 73-.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2016/V0/I3/73