dam ›› 2015, Vol. 0 ›› Issue (6): 48-.
Previous Articles Next Articles
LI Xiu-lin, XIA Shi-fa, LI Rong, LI Meng and WANG He-ran
Received:
Online:
Published:
李秀琳1,2,夏世法1,2,李蓉1,2,李萌1,2,王贺然3
作者简介:
基金资助:
Abstract: A RCC gravity dam's upstream face was in a state of bare because of the insulation board falling off in December 2010. As extremely low temperature outside in winter, short-term temperature drop caused large thermal stress in the upstream surface of concrete dam. In order to calculate thermal stress before and after the insulation board falling off, a feedback numerical simulation was made by 3-D finite element method based on measured temperature data. And the influence of insulation board on dam stress was evaluated.
Key words: roller compacted concrete, gravity dam, insulation board, thermal stress, feedback analysis
摘要: 2010年12月新疆某碾压混凝土重力坝上游面保温板脱落,坝面处于裸露状态。由于此时正值寒冬时节,外界气温极低,短时温度骤降导致坝体上游面混凝土内产生了较大的温度应力。通过实测温度资料,进行三维有限元反馈分析,计算保温板脱落前后混凝土温度应力的变化情况,评估了保温板脱落对坝体应力造成的影响。
关键词: 碾压混凝土, 重力坝, 保温板, 温度应力, 反馈分析
LI Xiu-lin, XIA Shi-fa, LI Rong, LI Meng and WANG He-ran. Feedback analysis on concrete thermal stress in a RCC gravity dam after upstream dam surface's insulation board falling off[J]. dam, 2015, 0(6): 48-.
李秀琳,夏世法,李蓉,李萌,王贺然. 某碾压混凝土重力坝上游保温板脱落后的混凝土温度应力反馈分析[J]. 大坝与安全, 2015, 0(6): 48-.