Treatment scheme of buried channel at Toudao Baiyanggou reservoir

ZHU Xin-ying   

  1. Xinjiang Hami Water Conservancy and Hydropower Survey Design Institute
  • Received:2015-03-02 Revised:2015-03-18 Online:2015-08-08 Published:2015-08-08

头道白杨沟水库古河槽处理方案设计

朱新英   

  1. 新疆哈密地区水利水电勘测设计院,新疆 哈密,839000
  • 作者简介:朱新英(1980- ),女,湖南蓝山人,工程师,从事水利水电工程规划、设计工作。

Abstract: It's the first discovery of buried channel in local reservoir dam site. Discovery, survey and selection of treatment scheme of buried channel at Toudao Baiyanggou reservoir is introduced for reference.

Key words: buried channel, survey, seepage, treatment scheme, reinforced concrete face

摘要: 古河槽在本地区水库枢纽坝址处属首次发现。通过对头道白杨沟水库古河槽的的发现、勘察、处理方案设计比选的介绍,为今后类似工程地质问题的勘察与设计提供参考。

关键词: 古河槽, 勘察, 渗漏, 处理方案, 钢筋混凝土防渗面板