dam ›› 2015, Vol. 0 ›› Issue (3): 41-.
Previous Articles Next Articles
SHANG Feng, QIU Yong-rong, LU Zheng-chao and FAN Zhe
Received:
Online:
Published:
商峰1,2,邱永荣1,2,卢正超1,2,范哲1,2
作者简介:
基金资助:
Abstract: As its maximum height reaches about 300 m and few similar engineering experiences have been encountered worldwide, much attention is focused on the stress and strain state of Xiluodu arch dam heel during the initial impounding period. Based on the monitoring data (by October 5th, 2014), this paper tries to analyze the stress and strain of the arch dam heel during the initial impounding period. Further, comparison with the finite element simulation is carried out. The analysis results shows that the stress process and the distribution on the arch dam are in accordance with the general laws. And the dam heel remains compressed when the reservoir water level reaches the normal elevation. It is suggested that the arch dam is working normally during the initial impoundment.
Key words: super high arch dam, safety monitoring, stress and strain analysis
摘要: 溪洛渡拱坝最大坝高接近300 m,国内外可借鉴的经验相对较少,建设和初次蓄水运行过程中的工作性态一直备受关注。根据溪洛渡拱坝内埋设的应变计组实测资料(截至2014年10月5日),计算拱坝在初次蓄水阶段的应力状态,分析其发展过程,并和有限元仿真计算结果相对比,为评估大坝运行的安全性提供依据。监测资料分析结果表明,拱坝应力发展过程和应力分布符合一般认识规律,库水位抬升至正常蓄水位后,坝踵和坝趾仍都处于受压状态,拱坝在初蓄期工作性态正常。
关键词: 特高拱坝, 安全监测, 应力应变分析
SHANG Feng, QIU Yong-rong, LU Zheng-chao and FAN Zhe. Analysis on monitored stress and strain of Xiluodu super high arch dam during initial impoundment[J]. dam, 2015, 0(3): 41-.
商峰,邱永荣,卢正超,范哲. 溪洛渡特高拱坝初蓄期应力应变监测资料分析[J]. 大坝与安全, 2015, 0(3): 41-.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2015/V0/I3/41