dam ›› 2015, Vol. 0 ›› Issue (3): 26-.
Previous Articles Next Articles
ZHANG Li-jun, WANG Yan-hua, LIU Feng-cheng and WU Yuan-hui
Received:
Revised:
Online:
Published:
张利军,王彦华,刘凤成,吴元辉
作者简介:
Abstract: To realize the continuous and automatic monitoring, GPS system is adopted for deformation monitoring of upper reservoir of Xilongchi pumped-storage power station and DDMS software is adopted for processing of monitoring data. The operation shows that the system is of high stability and over 98% efficient solutions rate is achieved by the DDMS in condition of no data missing. For different part, different monitoring periods are set. The plane and elevation results of 2-hour and 4-hour are accurate as required.
Key words: GPS, deformation monitoring system, baseline solution, GPS data processing
摘要: 为实现西龙池抽水蓄能电站上水库表面变形的连续性自动化监测,建立了电站上水库GPS 连续运行监测系统,研制了DDMS 软件进行GPS 变形监测数据的适时处理。实际运行表明,系统具有较高的稳定性;DDMS 软件在观测数据无缺失的情况下,提供有效解的概率高于98%;依据电站不同工程部位观测条件设置的GPS 测量时段,其2 h 和4 h 时段解算的平面、高程成果均能满足监测点设计精度要求,对类似工程高效率实时自动化GPS 变形监测系统的建立具有借鉴意义。
关键词: GPS, 变形监测系统, 基线解算, GPS 数据处理
ZHANG Li-jun, WANG Yan-hua, LIU Feng-cheng and WU Yuan-hui. Application of GPS in surface deformation monitoring of upper reservoir of Xilongchi pumped storage power station[J]. dam, 2015, 0(3): 26-.
张利军,王彦华,刘凤成,吴元辉. GPS 在西龙池抽水蓄能电站上水库表面变形监测中的应用[J]. 大坝与安全, 2015, 0(3): 26-.