Technical study and application of T-type floating emergency gate for left spillway of Jiangkou hydropower station

WANG Nan-shan, HU Li and DING Li-jun   

  1. CPI Jiangxi Electric Power Co., Ltd. Jiangkou Hydropower Plant
  • Received:2014-04-16 Online:2015-04-08 Published:2015-04-08

江口水电站左岸溢洪道T型浮塞式检修闸门技术研究与应用

王南山,胡力,丁丽军   

  1. 中电投江西电力有限公司江口水电厂,江西 新余,338025
  • 作者简介:王南山(1966- ),男,江西景德镇人,高级工程师,主要从事水电厂安全生产管理工作。

Abstract: Considering the situation that these is no emergency gate for gate replacement engineering at left spillway of Jiangkou hydropower station, reasonable water plugging plan should be advanced. This paper analyses the technical scheme of additional emergency gate, and discusses structure design and application of floating emergency gate. Meanwhile, the further optimization is studied, for reference.

Key words: hydraulic engineering, spillway, floating emergency gate, water seal

摘要: 针对江口水电站左岸溢洪道闸门更换工程无检修闸门的情况,提出合理堵水方案保证施工。就增设检修闸门的技术方案进行了认真研究,对浮塞式检修闸门的结构设计和安装应用进行了论述,并根据实际情况对其进行了进一步优化,为类似工程设计提供参考。

关键词: 水利工程, 溢洪道, 浮塞式闸门, 水封