Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan arch dam

HAN Shi-dong, ZHAO Bin, LIAO Zhan-yong and et al.   

  • Online:2010-06-28 Published:2010-06-28

小湾特高拱坝蓄水初期垂线监测成果分析评价

韩世栋,赵斌,廖占勇,夏家鸿   

  1. 国网电力科学研究院,江苏南京 210003

Abstract: Xiaowan arch dam is the highest arch dam in impoundment period in China. Based on monitoring data of plumb lines in early impoundment period, this paper analysed and evaluated the deformation of dam body and foundation. The regularity of monitoring data was normal, and of great reference value to other ultra-high arch dam.

摘要: 小湾拱坝是当前我国已进入蓄水阶段的最高坝。主要针对小湾拱坝的垂线监测资料,对蓄水初期的坝体坝基变形进行了分析评价,分析认为小湾拱坝垂线监测规律性好,监测成果对其它特高拱坝垂线监测有着重要参考价值。