• Design study • Previous Articles     Next Articles

Selection of powerhouse position and design of structures arrangement at Xiazhien hydropower station

YANG Zhong-liang, DING Bing-yong, LIN Xiao-fang and et al.   

  • Online:2010-10-28 Published:2010-10-28

下只恩水电站厂房位置选择及厂区布置设计概述

杨忠良,丁兵勇,林小芳,戴中飞   

  1. 中国水电顾问集团华东勘测设计研究院,浙江杭州 310014

Abstract: This paper discussed the design of structures arrangement at Xiazhien hydropower station in feasibility study and construction design. As well, the position selection of powerhouse and optimization were presented.

摘要: 论述了下只恩水电站可研和技施设计阶段厂区建筑物的布置,阐述了厂房位置调整及优化设计过程,并详细介绍了技施设计的厂区布置情况。