• Data analysis • Previous Articles Next Articles
QI Jian-tang
Online:
Published:
齐建堂
Abstract: There were many defects with auxiliary dam construction, and vertical cut-off wall solved them. By analyzing the monitoring data, the conclusion was gotten that the monitoring instruments and measured stress-strain of the cut-off wall were normal, as well, with normal impoundment, the cut-off wall was safe.
摘要: 副坝工程存在许多问题,垂直混凝土防渗墙的实施彻底解决了这些隐患。对防渗墙观测资料的分析计算说明,防渗墙埋设的观测仪器工作正常,防渗墙的应力应变正常,且具备一定的规律。正常蓄水情况下,防渗墙的运行是安全的。
齐建堂. 黄壁庄水库副坝防渗墙监测资料分析[J]. .