Abstract: Taking the repair of the settlement joints on drainage gallery at Dajiang hydropower station of Gezhouba project as a good example, combined with treatment of seepage by grouting, the paper introduced the treatment measures and techniques, for reference.
摘要: 以葛洲坝大江电站10.5 m排水廊道沉降缝修补为例,结合灌浆处理混凝土缝漏水这一典型工况,详细介绍了漏水方案的处理措施及工艺,为今后类似缺陷处理提供参考。
曾辉,张壮志,刘畅快. LW/HW 在葛洲坝大江电站排水廊道渗漏缺陷处理中的应用[J]. .