Monitoring of cracks on the guide wall of block No. 7 of Hunanzhen dam and treatment

SHI Yong-xin   

  • Online:2012-06-28 Published:2012-06-28

湖南镇大坝7 号坝段导墙裂缝监测及处理

施永新   

  1. 浙江华电乌溪江水力发电厂,浙江衢州 324000

Abstract: The paper analyzed the change rule of the cracks on the guide wall of block No. 7 of Hunanzhen dam. As well, its influence on the safety of the guide wall was evaluated. At last, the treatment method and effect were presented, for reference.

摘要: 分析了7号坝段导墙裂缝的变化规律,并对裂缝是否会影响导墙结构安全进行了评估,同时介绍了所采取的裂缝修补处理方法和效果。