• Monitoring technology • Previous Articles     Next Articles

Application of hydrostatic leveling system in deformation monitoring of Huanglongtan dam

LIANG Guo-qing, ZHOU Jiao-jiao and DONG Hai-bo   

  • Online:2012-06-28 Published:2012-06-28

静力水准系统在黄龙滩大坝变形监测中的应用

梁国清1,周娇娇1,董海波2   

  1. 1.湖北黄龙滩水力发电厂,湖北十堰 442000;2.南京南瑞集团公司,江苏南京 210024

Abstract: Automatic hydrostatic leveling system was adopted for vertical displacement monitoring of Huanglongtan dam. The paper introduced its application. By comparison of the monitoring data by automatic hydrostatic leveling system and by manual work, the availability of the system was proved.

摘要: 黄龙滩大坝垂直位移监测采用静力水准自动化量测方式进行改造。对静力水准系统在黄龙滩大坝垂直位移监测中的实施做了简要介绍,对试运行期自动化与人工监测数据进行了成果分析,两者符合较好,总结了静力水准系统应用成效。