• Monitoring technology • Previous Articles     Next Articles

Analysis on monitoring of concrete impervious face-slab masonry gravity rockfill dam

CHEN Song-jian and XU Miao   

  • Online:2011-02-28 Published:2011-02-28

混凝土防渗面板浆砌石重力墙堆石坝安全监测分析

陈松建1,许淼2   

  1. 1.松阳县东坞水库管理处,浙江松阳 323400;2.杭州国电大坝安全工程有限公司,浙江杭州310030

Abstract: According to monitoring data of a reservoir in Zhejiang province, the paper analyzed the new concrete gravity wall and deformation of the original impervious panel cracks. Further, seepage was evaluated after construction of concrete gravity wall and curtain grouting in dam foundation. It revealed the characteristics of seepage at concrete impervious face-slab masonry gravity rockfill dam.