• Data analysis • Previous Articles     Next Articles

Analysis on operation of water diversion system of a hydropower project in Xinjiang

ZHANG Feng   

  • Online:2012-08-28 Published:2012-08-28

新疆某工程发电引水系统运行性态分析评价

张峰   

  1. 新疆伊犁河流域开发建设管理局,新疆乌鲁木齐 830000

Abstract: The water diversion system consists of cast-in-situ concrete high-pressure tunnel (without lining) and penstock (with lining), which is 427.43 m-long. By analysis on monitoring data, we understood its change laws about strain and stress as well as its operation, worthy reference.

摘要: 发电引水系统由混凝土现浇(无钢衬)高压隧洞段、压力钢管(钢衬)段组成,全长427.43 m。通过对实测资料的分析,掌握了系统应力应变的变化规律及工作性态,为安全发、供电提供了保障。