Performance analysis on pre-stressed pier of Gezhouba project

Feng Xing-chang   

  • Online:1988-06-28 Published:1988-06-28

葛洲坝工程预应力闸墩工作性态分析

冯兴常   

  1. 长江科学院

Abstract: In this paper the working condition of the pre-stressed pier of first river sand sluice and second river discharging sluice and third river sand sluice of Gezhouba project is analyzed. The pre-stressing loss, edge and shrinkage section stress distribution of the piers are also studied and compared with the results of design and test. From above study we recognize that the design of pre-stressed piers is reasonable and working condition is normal.?

摘要: 本文对大江冲砂闸、二江泄水闸、三江冲砂闸的预应力闸墩工作性态作了分析,其中对预应力损失,闸墩边缘应力,颈部应力作了分析,并与设计试验成果进行比较,认为预应力闸墩结构设计是合理的,工作性状是正常的。