Influence of excavation depth of overburden on settlement of sluice bottom plate

LV Gao-feng and ZHU Jin-jie   

  1. Large Dam Safety Supervision Center of National Energy Administration
  • Received:2013-09-03 Online:2014-03-01 Published:2014-03-01

覆盖层开挖深度对闸底板沉降的影响分析

吕高峰,朱锦杰   

  1. 国家能源局大坝安全监察中心,浙江 杭州,310014
  • 作者简介:吕高峰(1987- ),男,浙江临安人,助理工程师,主要从事大坝安全监测与结构分析工作。

Abstract: Building a dam on the overburden, excavation of overburden and backfill are always effective measures to reduce dam settlement. Depth of overburden excavation has great influence on dam settlement. Combined with a case study, the paper presented the schemes with different excavation depths. Based on material parameters in test, finite element calculation and comparison of calculation results were carried out, worthy reference for schemes selection.

Key words: overburden, sluice bottom plate, settlement, excavation depth, Duncan-Chang E-B model

摘要: 在覆盖层上建坝,为减小坝体沉降,常对覆盖层进行开挖和回填。覆盖层开挖回填深度对坝体沉降变形影响较大。以某闸坝工程为例,拟定不同的开挖深度方案,根据室内试验参数,分别进行有限元计算,并对比分析计算结果,为开挖深度方案选择提供参考性意见。