• Monitoring • Previous Articles Next Articles
Gong Jian-bing and Wu Xiao-ming
Published:
贡建兵,吴晓铭
Abstract: This paper discussed system’s constitution and design principle of external deformation monitoring automation system for high slope near dam and bank slope of Geheyan Hydropower Project. It also analyzes the operation methods and its accuracy.?
摘要: 本文论述了隔河岩水利枢纽近坝区高边坡和库岸滑坡外部变形监测自动化系统的设计原则、系统组成,并对系统的作业方法和精度进行了分析。
贡建兵,吴晓铭. 隔河岩水利枢纽近坝区高边坡和库岸滑坡外部变形监测自动化系统[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX