Leakage treatment through expansion joints on overflow of Zhexi Dam

Xiao Shi-wang   

  • Published:2002-06-28

柘溪大坝溢流面伸缩缝漏水处理及效果分析

肖时望   

  1. 柘溪水电站,湖南安化 413508

Abstract: Water leakage through expansion joints on overflow of Zhexi Dam has always been a problem for many years. Three schemes have been studied successively and performed after, which achieved a good effect that ensured the dam in operation safe and stable.?

摘要: 多年来,柘溪大坝溢流面伸缩缝漏水一直是一道难题,经过电站管理人员的探索和研究,先后制订了三个方案,并予以实施。实施后,取得良好的效果,保证了柘溪大坝的安全稳定。?