• Pumped storage stations • Previous Articles Next Articles
Wang Ying-yong, He Hui-sheng and ZHANG Song-lin, et al.
Published:
王瀛勇1,何惠生1,张松林2,张正禄2,张军2
Abstract: This paper introduces the important of second grade leveling for setting up of the construction control of pump storage hy-dropower stations. It compares and analyzes the design and results of second grade leveling for three pump storage hydropower stations.?
摘要: 针对抽水蓄能电站施工控制网的特点,论述了用二等水准测量进行高程控制的必要性,对泰安、桐柏和宜兴三个网的水准高程控制测量设计、实施和成果进行了比较分析。
王瀛勇,何惠生,张松林,张正禄,张军. 关于抽水蓄能电站的水准高程控制测量[J]. .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://magtech.dam.com.cn/EN/
http://magtech.dam.com.cn/EN/Y2002/V0/I5/24