ISSN 1671-1092 CN 33-1260/TK
太平湾水电站尾水渠清淤工程管理及效益分析
李兆峰,杨小卉
Management on excavating silt at the tailrace tunnel in Taipingwan hydropower station
. 2005, (1): 67 -69 .