ISSN 1671-1092 CN 33-1260/TK
锦屏二级水电站1号引水隧洞施工期安全监测资料初步分析
吴忠明 1,沈亚兴 1,杨发栋 2,李树林 1
Analysis on monitoring data during construction of the diversion tunnel No.1 of Jinping Ⅱ hydropower station
WU Zhong-ming, SHEN Ya-xing,YANG Fa-dong and LI Shu-lin
大坝与安全 . 2013, (3): 36 -40 .