长甸水电站引水隧洞最大埋深洞段运行安全性分析
姜润东,武维毓,曲洪钧,谭诚,房国忠,吕子旭
Operational safety analysis on the section with maximum buried depth of headrace tunnel of Changdian hydropower station
JIANG Run- dong, WU Wei- yu, QU Hong- jun, TAN Cheng, FANG Guo-zhong and LV Zi-xu
大坝与安全
.
2019, (2): 38
.