ISSN 1671-1092 CN 33-1260/TK
红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工
张伟,张正平
Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam
. 2009, (4): 67 -70 .