• 资料分析 • 上一篇 下一篇
周晖
发布日期:
ZHOU Hui
Published:
摘要: 本文对应变计的安装埋设方法进行简介,并对对河口水库大坝某槽段混凝土应变计施工期的观测资料进行初步计算分析,为分析评价施工及安全监测提供依据。
Abstract: This article briefly introduces the embedding steps of strain metre. The observed data during construction period embedded in concrete in a certain section has been analyzed, which provides the basis for construction evaluation and safety monitoring.
周晖. 对河口水库大坝防渗墙施工期观测资料初步分析[J]. .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2005/V0/I3/46