ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2013 ›› Issue (3): 23-26.

• 运行管理 • 上一篇    下一篇

丹江大坝加高蓄水对黄龙滩大坝防渗和排水影响分析

梁国清,顾绍峰   

  1. 湖北黄龙滩水力发电厂
  • 收稿日期:2013-01-18 出版日期:2013-07-01 发布日期:2013-07-01
  • 作者简介:梁国清(1975-),男,水工观测技师、助理工程师,长期从事大坝安全监测及水工建筑物维护工作。

Influence of higher-level storage of Danjiang dam on seepage-prevention and drainage of Huanglongtan dam

LIANG Guo-qing and GU Shao-feng   

  1. Huanglongtan Hydropower Plant
  • Received:2013-01-18 Online:2013-07-01 Published:2013-07-01

摘要: 丹江大坝加高是南水北调中线控制性工程,黄龙滩电站位于丹江口水利枢纽上游,两者相距153 km。笔者将丹江回水可能对黄龙滩大坝、水工建筑物防渗及排水的不利影响进行分析,并提出了一些具体的建议与对策。

关键词: 丹江大坝加高, 黄龙滩防渗, 排水, 影响

Abstract: Huanglongtan hydropower station locates upstream of Danjiang dam, spaced 153 km. The paper analyzed the adverse influence of backwater of Danjiang dam on Huanglongtan dam, seepage-prevention of structures and the drainage. Accordingly, some suggestions and countermeasures were advanced, for reference.

Key words: heightening of Danjiang dam, seepage-prevention of Huanglongtan dam, drainage, influence