低温高水位对紧水滩拱坝性态影响实测分析

张 巍   

  1. 紧水滩水力发电厂,浙江 丽水,323000
  • 收稿日期:2017-05-08 出版日期:2017-08-08 发布日期:2017-08-08
  • 作者简介:张 巍(1966- ),男,江苏无锡人,高级工程师,从事水库大坝安全运行管理。

Influence analysis of low temperature and high water level on behavior of Jinshuitan arch dam

ZHANG Wei   

  1. Jinshuitan Hydropower Plant
  • Received:2017-05-08 Online:2017-08-08 Published:2017-08-08

摘要: 介绍了紧水滩拱坝在低温高水位情况下的结构性态反应,并根据变形及渗流的实测成果就不利工况对拱坝性态的影响进行了分析。

关键词: 紧水滩拱坝, 低温高水位, 实测性态分析

Abstract: This paper introduces the structural performance reaction of Jinshuitan arch dam under the condition of low temperature and high water level. Based on monitoring data of deformation and seepage, the behavior of arch dam under unfavorable cases is analyzed.

Key words: Jinshuitan arch dam, low temperature and high water level, observed behavior analysis