大坝与安全 ›› 2015 ›› Issue (5): 20-.
• 安全评价 • 上一篇 下一篇
张 毅,李 季,王念仁
收稿日期:
出版日期:
发布日期:
作者简介:
ZHANG Yi, LI Ji and WANG Nian-ren
Received:
Online:
Published:
摘要: 结合李家峡拱坝左岸坝肩锚索加固的现状,采用大坝原型加密观测试验成果,并运用间接评价方法和有限元仿真模拟计算,对坝肩预锚超载加固效果进行评价。分析认为,左岸坝肩超载加固后,左重力墩表部群锚加固区的径、切向拉应力值减小或拉应力转变为压应力或压应力变大,应力分布有均匀化趋势。结论是超载加固提高了左岸坝肩的整体稳定性。
关键词: 李家峡大坝, 超载加固, 工作性态, 评价
Abstract: Combined with current situation of reinforcement by anchor cable at the left abutment of Lijiaxia arch dam, prototype observation test results and simulation by FEM were used to evaluate the reinforcement effect. By analysis, the conclusion was gotten that after the reinforcement, the original tensile stress in the reinforcement area reduced or turned into compressive stress, or the compressive stress increased and the stress distribution was becoming homogenized. As a result, the reinforcement enhanced the stability of the left abutment.
Key words: Lijiaxia dam, overload, working behavior, evaluation
张 毅,李 季,王念仁. 基于监测成果的李家峡拱坝左岸坝肩超载加固效果评价[J]. 大坝与安全, 2015, 0(5): 20-.
ZHANG Yi, LI Ji and WANG Nian-ren. Effect assessment of reinforcement for overload at the left abutment of Lijiaxia arch dam based on monitoring data[J]. dam, 2015, 0(5): 20-.