大坝与安全 ›› 2025 ›› Issue (6): 63-.

• 资料分析 • 上一篇    下一篇

特高拱坝坝踵实测应力调研与分析

曾 超   

  1. 中国电建集团华东勘测设计研究院有限公司,浙江,杭州,311122
  • 出版日期:2025-12-20 发布日期:2026-02-05

Investigation and analysis on measured stress in the heel of super high arch dams

by ZENG Chao   

  1. PowerChina Huadong Engineering Co., Ltd.
  • Online:2025-12-20 Published:2026-02-05

摘要: 拱坝坝踵实测应力是运行期判断其受力状态的重要依据,通常采用压应力计和应变计组进行监测。对国内特高拱坝坝踵实测应力进行了调研,归纳总结了运行期坝踵实测应力水平及其变化规律。结果表明,运行期特高拱坝坝踵垂直向压应力实测值较大,与设计计算值差异较大,但两者受上游水压力的影响规律一致。经分析,计算假定与实际存在差异、监测部位与计算部位不同、实测应力计算存在误差、无应力计明显受力是造成两者差异的主要原因,且在坝踵发生开裂的有缝状态下,压应力计和应变计组监测坝踵应力均存在局限性,不能真实反映坝踵拉应力。建议在评价拱坝坝踵运行状态时,结合坝踵变形、坝基渗压、渗漏量和实测应力等监测结果进行综合分析。

关键词: 特高拱坝, 坝踵, 实测应力, 监测资料分析

Abstract: The measured stress in the heel of arch dam is an important basis for evaluating the stress state during operation, which is usually monitored by compressive stress gauges and strain gauges. This paper investigates the measured stress in the heel of super high arch dams in China and summarizes the measured stress level and its variation laws during operation. The results indicate that the measured val ⁃ ues of vertical compressive stress in the heel of super high arch dams during operation is large, which differs greatly from the design calculation values, while both of them are affected by the upstream water pressure in the same way. After analysis, the main reasons for the difference between measured values and design calculation values are the difference between assumed and actual conditions, the different monitoring and calculation sites, the error in measured stress calculation and obvious stress on stress- free gauges. Moreover, in the cracked state of dam heel, the compressive stress gauges and the strain gauges both have limitation in monitoring the dam heel stress and cannot truly reflect the tensile stress. It is recommended that the monitoring results such as deformation of dam heel, seepage pressure of dam foundation, leakage volume and measured stress should be analyzed comprehensively when evaluating the operational status of the arch dam heel.

Key words: super high arch dam, dam , heel,  , measured , stress,  , monitoring , data , analysis