大坝与安全 ›› 2023 ›› Issue (1): 23-25.

• 运行管理 • 上一篇    下一篇

取水工程对长江河道的防洪影响及应对措施

周金岩   

  1. 安徽省长江河道管理局,安徽 芜湖,241000
  • 收稿日期:2020-03-03 修回日期:2020-03-11 出版日期:2023-02-10 发布日期:2023-04-18
  • 作者简介:周金岩(1984—),男,山东金乡人,硕士,高级工程师,从事水利工程安全与质量管理工作。
  • 基金资助:
    TV67

Influence of water intake project on flood control of Yangtze river and its countermeasures

ZHOU Jinyan
  

  1. Anhui Yangtze River Administration Bureau
  • Received:2020-03-03 Revised:2020-03-11 Online:2023-02-10 Published:2023-04-18

摘要:

无为市长江取水工程施工方式包括顶管、挖槽、钻孔灌注桩等。经分析,工程建设改变了附近区域的水位 流速条件,对两岸堤防渗流稳定、河段岸坡稳定有一定不利影响,对河段总体河势及局部河势稳定无不利影响,对 比提出堤防加固、岸坡防护和基础防渗应对措施,为进一步减轻洪水影响提出合理化的建议。

关键词:

Abstract:

The construction methods of Yangtze river water intake project in Wuwei City include pipe jacking, trenching, borehole grouting pile and so on. The project has changed the water level and velocity conditions in nearby area, which has a certain adverse impact on the embankment seepage and stability of bank slope, but has no adverse impact on the overall and local stability of river regimes. In this regard, measures for embankment reinforcement, bank slope protection and foundation seepage prevention are put forward, and reasonable suggestions are put forward to further reduce the impact of flood.

Key words: