白鹤滩水电站重大件运输概况

宋刚云,陈  浩,杜清玭   

  1. 中国长江三峡集团公司,四川  成都,610094
  • 收稿日期:2020-09-20 出版日期:2021-06-08 发布日期:2021-11-25
  • 作者简介:宋刚云(1967— ),男,湖北黄陂人,高级工程师,主要从事大型水电机组安装管理工作。

Overview of transportation of major parts for Baihetan hydropower station

SONG Gangyun, CHEN Hao and DU Qingpin#br#   

  1. China Three Gorges Corporation
  • Received:2020-09-20 Online:2021-06-08 Published:2021-11-25

摘要: 白鹤滩水电站装机容量和单机容量巨大,重大件运输方案的研究是重要的工作内容。笔者结合可行性研究的成果,介绍了主要重大件运输实施的概况,供参考。

关键词: 白鹤滩水电站, 1 000 MW水轮发电机组, 重大件运输

Abstract: Baihetan hydropower station has a huge installed capacity as well as large unit capacity, therefore, the transportation of major parts is one of the important tasks. Combined with the feasibility study of Baihetan hydropower station, the implementation of transportation of the major parts is introduced in this paper, for reference.

Key words: Baihetan hydropower station, 1 000 MW hydropower generator unit, transportation of major part