Design and arrangement of metal structures at Qiongzhong pumped storage power station

XUE Feng and CAI Xingyu   

  1. PowerChina Zhongnan Engineering Co., Ltd.
  • Received:2019-04-15 Online:2020-02-08 Published:2020-02-08

摘要: 琼中抽水蓄能电站为海南省第一座蓄能电站,目前上、下水库均已下闸蓄水,3台机组于2018年全部发电。对琼中抽水蓄能电站金属结构设计及布置进行了详细的阐述,供参考。

关键词: 琼中抽水蓄能电站, 金属结构, 设计, 布置

Abstract: Qiongzhong pumped storage power station is the first pumped storage power station constructed in Hainan province. The impoundment of both upper reservoir and lower reservoir was accomplished, and all of the three generation units were put into generation in 2018. A detailed description of the design and arrangement of metal structures at Qiongzhong pumped storage power station is presented in this article, for reference.

Key words: Qiongzhong pumped storage power station, metal structures, design, arrangement