ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2018 ›› Issue (4): 49-52.

• 补强加固 • 上一篇    下一篇

二滩水电站右岸雾化区高边坡塌滑治理浅析

吴文勇,杨银辉,闵四海   

  1. 雅砻江流域水电开发有限公司,四川 成都,610051
  • 收稿日期:2018-04-19 修回日期:2018-05-24 出版日期:2018-08-08 发布日期:2018-08-08
  • 作者简介:吴文勇(1993- ),男,浙江衢州人,助理工程师,从事水工建筑物维护管理工作。

Analysis on collapse and sliding control of high slope in atomized area of right bank of Ertan hydropower station

WU Wen-yong, YANG Yin-hui and MIN Si-hai   

  1. Yalong River Hydropower Development Co., Ltd.
  • Received:2018-04-19 Revised:2018-05-24 Online:2018-08-08 Published:2018-08-08

摘要: 根据二滩水电站右岸边坡地质条件,对边坡塌滑变形区域进行划分,深入分析塌滑变形破坏机理,综合探讨有效、可行的治理方案,有针对性地采取防护治理措施。实践表明,雾化区边坡治理非常成功,再未发生塌滑情况。

关键词: 边坡, 变形, 治理

Abstract: According to the geological conditions of the right bank slope of Ertan hydropower station, the area of slope collapse and sliding is divided, the failure mechanism of slope collapse and sliding is analyzed in depth, the effective and feasible treatment scheme is discussed comprehensively, and protective measures are taken accordingly. The practice shows that the slope collapse and sliding control in atomized area is very successful, and no collapse happen again.

Key words: slope, deformation, treatment