岗曲河一级水电站厂房后边坡加强支护实施情况概述

王  彪   

  1. 云南省迪庆州小中甸水库管理局,云南  迪庆,674499
  • 收稿日期:2018-01-11 修回日期:2018-01-29 出版日期:2018-06-08 发布日期:2018-06-08
  • 作者简介:王 彪(1981- ),男,藏族,云南维西人,高级工程师,主要从事水利水电工程建设与管理工作。

Support of slope behind powerhouse at Gangquhe I hydropower station

WANG Biao   

  1. Management Bureau of Xiaozhongdian Reservoir
  • Received:2018-01-11 Revised:2018-01-29 Online:2018-06-08 Published:2018-06-08

摘要:

水电站厂房后边坡的施工存在很多难点,需要及时总结。笔者介绍了岗曲河水电站的厂房后边坡施工情况,供参考。

关键词: 岗曲河一级水电站, 厂房, 边坡, 施工

Abstract: There are a lot of construction difficulties in support of slope behind powerhouse. This paper introduces the implementation of support of slope at Gangquhe I hydropower station, for reference.

Key words: Gangquhe I hydropower station, powerhouse, slope, construction