孔头水电站尾水渠检修门槽水下补强加固

王超杰1,万 磊1,贾丽娟2   

  1. 1.福建省金湖电力有限责任公司,福建 将乐,353300;2.青岛太平洋水下科技工程有限公司,山东 青岛,266100
  • 收稿日期:2017-07-20 出版日期:2018-04-08 发布日期:2018-04-08
  • 作者简介:王超杰(1981- ),男,福建三明人,工程师,主要从事大坝维护、水库调度工作。

Underwater reinforcement of bulkhead gate slot of tailrace in Kongtou hydropower station

WANG Chao-jie, WAN Lei and JIA Li-juan   

  1. Fujian Jinhu Electric Power Co., Ltd.
  • Received:2017-07-20 Online:2018-04-08 Published:2018-04-08

摘要: 孔头电站为低水头河床式中型水电站,经过水下检查发现检修门槽底部止水钢板底面混凝土处存在多处缺陷。根据设计方案及现场实际情况,采用水下环氧混凝土浇筑补强加固处理技术,最终取得了良好效果,可为类似工程补强加固提供参考。

关键词: 门槽, 水下, 补强加固

Abstract: Kongtou hydropower station is a medium sized run-of-river hydropower station with low water head. After underwater inspection, it was found that there were many defects in the underside concrete of water stop steel plate at the bottom of the bulkhead gate slot. According to the design plan and the actual situation of the site, the reinforcement technology of underwater epoxy concrete have been adopted, and good results have been obtained, which could provide reference for similar projects.