ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2017 ›› Issue (6): 7-9.

• 运行管理 • 上一篇    下一篇

美国奥洛维尔水库溢洪道事故的反思

李 健,王辉义   

  1. 国家能源局大坝安全监察中心,浙江 杭州,311122
  • 收稿日期:2017-10-13 出版日期:2017-12-08 发布日期:2017-12-08
  • 作者简介:李 健(1979- ),男,湖北随州人,高级工程师,主要从事大坝设计与监管工作。

Reflection on Oroville spillway incident

LI Jian and WANG Hui-yi   

  1. Large Dam Safety Supervision Center, National Energy Administration
  • Received:2017-10-13 Online:2017-12-08 Published:2017-12-08

摘要: 简要介绍奥洛维尔水库溢洪道冲刷破坏经过,并从泄洪建筑物布置、基础处理、泄槽结构、掺气减蚀等设计方面与国内工程进行对比分析与反思,简述了奥洛维尔水库溢洪道设计存在的不足和改进意见,可供类似工程的溢洪道设计借鉴。

关键词: 奥洛维尔大坝, 泄洪建筑物, 溢洪道设计, 冲刷破坏

Abstract: The erosion of Lake Oroville spillway is briefly introduced. From the aspects including design of flood discharge structure layout, foundation treatment, chute structure and aeration corrosion reduction etc., the spillway of Lake Oroville is compared with domestic projects. As well, the shortcomings and improvement suggestions of Lake Oroville spillway design are introduced, worthy reference for the spillway design of similar projects.

Key words: Oroville dam, flood discharge structure, spillway design, erosion damage