印度兰吉特大坝的泥沙管理

印度·Siba Prasad Sen   

  • 收稿日期:2017-04-27 出版日期:2017-06-08 发布日期:2017-06-08
  • 作者简介:文献来源:HYDRO REVIEW WORLDWIDE 编译:崔弘毅 校核:许传桂

Sediment management for Rangit dam in India

Siba Prasad Sen   

  • Received:2017-04-27 Online:2017-06-08 Published:2017-06-08

摘要: 印度兰吉特河(Rangit)是提斯塔河(Teesta)的主要支流,位于东喜马拉雅地区。兰吉特水电站装机60 MW,于2000年2月投入运行。每年5~9月汛期之间,兰吉特河输沙量巨大,2006年,该电站发生水淹厂房事故。

关键词: 兰吉特大坝, 沉积物, 修复

Abstract: Rangit River, a major tributary of River Teesta, in the Eastern Himalaya supplies the 60 MW Rangit Hydro Power Station which was commissioned in February 2000 by NHPC. However, the river transports a large quantity of silt with its water during the monsoon months of May to September and during an incident in 2006 the project's powerhouse was flooded.

Key words: Rangit dam, sediment, repair