ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2016 ›› Issue (5): 41-.

• 资料分析 • 上一篇    下一篇

丰满大坝重建施工期老坝运行性态分析

李作光   

  1. 丰满发电厂,吉林 吉林,132108
  • 收稿日期:2016-02-29 修回日期:2016-03-17 出版日期:2016-10-08 发布日期:2016-10-08
  • 作者简介:李作光(1966- ),男,吉林桦甸人,硕士,高级工程师,主要研究方向为大坝安全监测。

Analysis on operation state of the original dam during reconstruction of Fengman dam

LI Zuo-guang   

  1. Fengman Hydropower Plant
  • Received:2016-02-29 Revised:2016-03-17 Online:2016-10-08 Published:2016-10-08

摘要: 对丰满大坝重建工程进行了简介,并对丰满大坝重建施工期老坝运行性态进行了分析,供参考。

关键词: 丰满大坝重建, 施工期, 老坝, 运行性态分析

Abstract:

In this paper, a brief introduction to the reconstruction project of Fengman dam was carried out, and the operation state of the original dam during reconstruction was analyzed, for reference.

Key words: reconstruction of Fengman dam, construction period, original dam, operation state analysis