大坝与安全 ›› 2016 ›› Issue (4): 62-.
• 施工技术 • 上一篇 下一篇
但其宝
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
DAN Qi- bao
Received:
Revised:
Online:
Published:
摘要: 论述了喜河水电站大坝坝基帷幕水泥补强灌浆及效果评价,对坝基扬压力超标的原因进行了简要分析,提出了基础渗控工程处理建议。
Abstract: The paper introduced the curtain grouting at dam foundation of Xihe hydropower station and its effect. As well, the cause reasons for excess uplift pressure are analyzed. Accordingly, seepage control measures are advanced, for reference.
Key words: dam foundation curtain, grouting, Xihe hydropower station
但其宝. 喜河水电站坝基帷幕补强灌浆实践与探讨[J]. 大坝与安全, 2016, 0(4): 62-.
DAN Qi- bao. Discussion on curtain grouting at dam foundation of Xihe hydropower station[J]. dam, 2016, 0(4): 62-.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2016/V0/I4/62