桐柏蓄能电站上水库主坝坝后坡渗水分析及处理

张士平   

  1. 华东桐柏抽水蓄能发电有限责任公司,浙江 台州,317000
  • 收稿日期:2015-10-18 修回日期:2016-01-15 出版日期:2016-06-08 发布日期:2016-06-08
  • 作者简介:张士平(1964- ),男,浙江杭州人,高级工程师,主要从事水工维护及监测工作。

Seepage analysis and treatment for back-slope of main dam of upper reservoir of Tongbai pumped storage power station

ZHANG Shi-ping   

  1. East China Tongbai Pumped-Storage Power Generation Co., Ltd.
  • Received:2015-10-18 Revised:2016-01-15 Online:2016-06-08 Published:2016-06-08

摘要: 通过对桐柏蓄能电站上水库主坝坝后坡渗水的分析,找出确切的渗水原因及渗水通道,并对渗水进行了有效处理,解决了坝后坡渗水缺陷,确保了大坝安全。

关键词: 主坝, 坝后坡, 渗水分析, 处理

Abstract: The cause and passage of seepage at back-slope of main dam of upper reservoir of Tongbai pumped storage power station were found after detailed analysis. The effect of treatment was proved to be successful which ensured the safety of main dam.

Key words: main dam, back-slope of main dam, seepage analysis, treatment