ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2015 ›› Issue (6): 13-.

• 设计研究 • 上一篇    下一篇

多沙河流上的水库增设泄洪洞的探讨

任衍红   

  1. 山西省临汾市水利勘测设计院,山西 临汾,041000
  • 收稿日期:2014-12-26 出版日期:2015-12-08 发布日期:2015-12-08
  • 作者简介:任衍红(1967- ),女,山西临汾人,工程师,主要研究方向为水利工程水文计算、工程设计及造价。

Addition of spillway tunnel for reservoir on sediment-laden river

REN Yan-hong   

  1. Water Conservancy Survey and Design Institute of Linfen, Shanxi Province
  • Received:2014-12-26 Online:2015-12-08 Published:2015-12-08

摘要: 泄洪洞的集中泄洪排沙对延长水库寿命和维持长期使用库容起着重要作用,设计泄洪洞时应处理好平面位置、进口高程、洞型及出口挑流段体型等几个技术问题。

关键词: 多沙河流, 水库, 泄洪洞, 排沙

Abstract: Concentrated flood discharge and desilting by spillway tunnel plays an important role to prolong the life of reservoir and retain active storage capacity in long-term. Several technical problems should be dealt with in the design of spillway tunnel, such as selection of plane position, inlet elevation, structural style and the type of outlet section.

Key words: sediment-laden river, reservoir, spillway tunnel, desilting