ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2014 ›› Issue (6): 21-23.

• 运行管理 • 上一篇    下一篇

华光潭水电站引水隧洞排空方案

应平   

  1. 浙江浙能华光潭水力发电有限公司,浙江 杭州,311322
  • 收稿日期:2014-09-09 出版日期:2014-12-18 发布日期:2014-12-18
  • 作者简介:应平(1985- ),男,浙江丽水人,工程师,运行主管,从事水电站运行管理工作。

Emptying of the diversion tunnel of Huaguangtan hydropower station

YING Ping   

  1. Zhejiang Zheneng Huaguangtan Hydropower Co. Ltd.
  • Received:2014-09-09 Online:2014-12-18 Published:2014-12-18

摘要: 有压式引水隧洞放空后,隧洞内外压力变化较大,存在着较大的坍塌风险,对排水过程有极其严格的要求。对华光潭水电站一级站引水隧洞排空方式进行了介绍,对同类型水电厂引水隧洞排空方案研究具有一定的借鉴作用。

关键词: 引水式水电站, 引水隧洞, 排空

Abstract: After emptying of the pressure diversion tunnel, the pressure change would cause great risk of collapse of the tunnel. Thus, strict requirements are put forward on the drainage process. This paper introduces the emptying scheme for the diversion tunnel of Huaguangtan hydropower station, for reference.

Key words: diversion type power station, diversion tunnel, emptying