ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2014 ›› Issue (2): 42-45.

• 资料分析 • 上一篇    下一篇

雪山湖水库溢洪道右导墙裂缝分析与处理

赵性发   

  1. 吉林两江水力发电股份有限公司,吉林 安图,133600
  • 收稿日期:2014-01-06 出版日期:2014-04-30 发布日期:2014-04-30
  • 作者简介:赵性发(1975- ),男,重庆人,主管水库大坝、水工建筑物安全、监测方面的工作。

Analysis on the cracks on the right guide wall of spillway at Xueshanhu reservoir and its treatment

ZHAO Xing-fa   

  1. Jilin Liangjiang Hydropower Co., Ltd.
  • Received:2014-01-06 Online:2014-04-30 Published:2014-04-30

摘要: 溢洪道右导墙产生裂缝的主原因是右导墙一侧有冰、另一侧无冰,形成较大的冰荷载,使右导墙向溢洪道侧变形较大,同时超过导墙允许应力及配筋,故在受力最大处及结构薄弱部位产生裂缝及较大变形。对裂缝产生原因进行了分析并提出了处理措施,供参考。

关键词: 混凝土冻融, 冰荷载, 裂缝, 干缩变形

Abstract: One side of the right guide wall of the spillway at Xueshanhu reservoir was icy while the other side was ice free. The great ice load caused the deformation of the right guide wall towards spillway. Cracks occurred where the maximal stress and the weakest structure existed. The paper analyzed the cause reasons and advanced treatment measures, for reference.

Key words: freeze-thaw of concrete, ice load, crack, shrinkage deformation