ISSN 1671-1092 CN 33-1260/TK

大坝与安全 ›› 2013 ›› Issue (5): 4-7.

• 运行管理 • 上一篇    下一篇

浅谈水电工程安全评价

王慧锋   

  1. 中国水电顾问集团华东勘测设计研究院有限公司,浙江 杭州,310014
  • 收稿日期:2013-09-12 出版日期:2013-10-31 发布日期:2013-10-31
  • 作者简介:王慧锋(1963-),女,黑龙江省哈尔滨人,高级工程师,安全评价项目副设总,主要从事水电工程安全评价和水电站厂房的水工建筑物设计工作。

Safety assessment in construction of hydropower projects

WANG Hui-feng   

  1. HydroChina Huadong Engineering Corporation
  • Received:2013-09-12 Online:2013-10-31 Published:2013-10-31

摘要: 简要介绍了基于建设项目安全设施“三同时”要求的水电工程安全评价体系及其实践情况,并与安全鉴定体系进行了对比分析。

关键词: 水电工程, 建设项目安全设施, 劳动安全与工业卫生, &ldquo, 三同时&rdquo, 安全评价, 安全鉴定

Abstract: This article briefly introduced the safety assessment system in construction of hydropower projects and its practical application, which based on the Three-Simultaneous Regulation. Further, the comparisonwithsafetyassessmentsystem was presented, for reference.

Key words: hydropower project, safety facilities in construction, labor safety and industrial health, Three-Simultaneous Regulation, safety assessment, safety appraisal