大坝与安全 ›› 2013 ›› Issue (2): 12-14.
• 运行管理 • 上一篇 下一篇
王有伟
收稿日期:
出版日期:
发布日期:
作者简介:
WANG You-wei
Received:
Online:
Published:
摘要: 对溪洛渡电站运行和检修工况下面临的安全风险因素进行了详细的分析,并提出了具体的应对策略,为水垫塘投入运行提供了具有价值的参考资料。
关键词: 溪洛渡水电站, 水垫塘, 运行, 检修, 策略
Abstract: In this paper, risk factors of Xiluodu hydropower station during operation and maintenance were analyzed in detail. Accordingly, strategies were put forward, which provided a valuable reference for the operation of water cushion.
Key words: Xiluodu hydropower station, water-cushion, operation, maintenance, strategy
王有伟. 溪洛渡电站水垫塘运行风险浅析[J]. 大坝与安全, 2013, 0(2): 12-14.
WANG You-wei. Analysis on the operation risk of water cushion at Xiluodu hydropower station[J]. dam, 2013, 0(2): 12-14.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://magtech.dam.com.cn/CN/
http://magtech.dam.com.cn/CN/Y2013/V0/I2/12